Instructions to install
GoldTop 14-200, 14-256 and 14-256-1 rebuild kit
Disassembly
Using the T-55 Torx bit provided, remove the friction plate. The threads are left hand - turn the T-55 Torx bit counter clockwise while holding the friction plate from rotating. It will help to apply air pressure to the clutch while removing the friction plate.
Once the friction plate is removed, hand-tighten the aluminum cage on the left hand threaded bolt. If you applied air pressure in step one remove it now.
Remove the lining screws with the T-27 Torx bit provided. Remove the lining.
Remove the Aluminum Spring Housing. Use two flat screwdrivers to carefully pry the Aluminum Spring Housing from the pulley.
Remove the large rubber seal and wipe the area clean.
Remove the retaining clip. Remove the Air Chamber Cap. Remove the Snap Ring. Remove the air chamber assembly. Clean the inside of the shaft.
Remove the bearing nut with a 2" socket.
The pulley will now slide off the shaft. Press out the bearings and save any spacers between the bearings.
Installation
Press in the two new bearings into the pulley (if there were spacers between bearings in the pulley, reuse them)
Install sheave over the journal bracket
Install the bearing nut. Torque to 125 Ft. Lbs.
Apply o-ring lube to the three o-rings on the air cartridge assembly and install the new air cartridge assembly in the journal bracket
Install the new snap ring over air cartridge assembly
Align the 8 holes in the Gold Top ä with the 8 holes in the pulley. Torque the 8 T-27 screws to 80 Inch-Lbs